Parts List

5.7 System Work Mode Setup Menu
Work Mode
Zero Export To Load
Zero Export To CT
Max Sell Power
Energy pattern
BattFirst LoadFirst
System Work Mode
Solar Sell
Solar Sell
4000
Selling First
Work
Mode1
Lithium Mode
Shutdown
Low Batt
Restart
80%
30%
10%
00
Battery Setting
Set3
Batt
Grid ChargeGen Charge
Grid SignalGen Signal
Gen Max Run Time 0.0 hours
Gen Down Time 0.5 hours
Battery Setting
Start
A
30% 30%
40A
40A
Batt
Set2
ʑ
This is Battery Setup page.
Start =30%---It indicates that the Generator will start when
the Battery capacity is less than 30% in the condition of
Off-grid mode.
A = 40A---It indicates the Current that the Generator
charges the Battery after started.
Gen Charge---The Switch that the Generator charges the
Battery.
Gen Signal ---It indicates whether the Generator's ATS
signal is on.
Max RunTime(x.xhous)Indicates that the generator is the
longest in a day,The time x.xhours can be run, and the
generator will be turned off when the time is up.
24.0hours (default) means that It keeps running without
shutting down.
DownTime(x.xhours)It indicates the delay of the
Generator to shut down after it has reached the run time.
ʏʑ
Start =30%---no use,for customization.
A = 40A--- It indicates the Current that the Grid charges
the Battery.
Grid Charge---The Switch that the Generator charges the
Battery.
Grid Signal ---Disable.
This is Grid Charge, you need select.
ʐ
Lithium Mode--This is BMS protocol.default is 0 please
reference the document(Approved Battery-Deye).
Shutdown 10%--the inverter will shutdown if the SOC is
below this.
Low Batt 20% --the inverter will shutdown if the SOC is
below this.
Restart 40% --Restart level when inverter shutdown.
This is Battery 4 tages charge voltage.
ʏ
ʐ
This is for professional installers,you can hold default
if you do not know.
Shutdown 10%--the inverter will shutdown if the SOC is
below this.
Low Batt 20% --the inverter will alarm if the SOC is
below this.
Restart 40% --Restart level when inverter shutdown.
ʑ
Float V
55.2V 41.0V
45.0V
52.0V
-5
Absorption V
57.6V
Equalization V
58.8V
Equalization Days
Shutdown
Low Batt
Restart
TEMPCO(mV/C/Cell)
Batt Resistance
90 days
Equalization Hours
2.0 hours
25mOhms
Battery Setting
Set3
Batt
ʏ
ʐ
ʑ
Work Mode
Selling First :It means that the excess energy has
priority in grid connection.
Zero Export To Load:It means output power according
to it consumed by the load.
Zero Export To CT :It means output power according
to the CT position.
Solar Sell :It means that the excess solar energy
can be integrated into the grid.
Max Sell Power 0-8000W
Energy Pattern
BattFirst--- It means solar power will charge battery first,
when battery is full then feed-out power to the
Load or Grid.
LoadFirst-- The solar energy will be used to supply the
local load first,then to charge the battery.The
redundant power will export to the public grid.
Time Of Use
Time
System Work Mode
Batt
~
~
~
~
~
~
Grid
Charge
Gen
01:00
5:00
05:00
9:00
09:00
13:00
13:00
17:00
17:00 21:00
21:00 01:00
80%
80%
80%
80%
80%
80%
Work
Mode2
ʏʐ ʑ
Time of use
ʏ
ʐ
ʑ
Switch for Grid charging the battery.
Switch for Gen charging the battery.
There are six time period can be set,
each period must from small to large.
- 25 - - 26 -