Installation Guide

23 | Diamond Kote Building Products Application Guide 6.18
OUTSIDE + INSIDE CORNER
WITH NAIL FIN APPLICATION
INSTALLATION
Hold outside and inside corners with
nailing n up to the wall, level, plumb
and set it to the correct height before
nailing.
Alternate nailing through the n in the
provided holes on both sides of the
corner.
Fasten EVERY 3RD HOLE. (Figure 7b)
DO NOT OVERDRIVE NAILS.
Nail heads should be set rmly to the
face of n, but should not be overdriven
to distort or damage the n surface.
STACKING:
FOR 2 CORNERS, ONE JOINT: Lightly
butt painted cut ends together and leave
a 3/16" gap where the top corner meets
the sot.
FOR 3 OR MORE CORNERS 2+ JOINTS:
Leave a 1/8" gap between painted cut
ends and apply a small bead of color
matched sealant by back caulking during
assembly. Leave a 3/16" gap where the
top corner meets the sot.
Figure 7b
Correct
Nailing
Pattern