Installation Guide

26 | Diamond Kote Building Products Application Guide 6.18
ARCH TRIM INSTALLATION
GENERAL
It's recommended to install arched trims
around the opening before cutting or
installing the sides or bottom trim.
Read and understand instructions.
Carefully remove trim from protective
packaging.
Place the Arched Trim over the arched
area and center it so the bottom ends
are level.
FASTENING:
Fastener length needs to be long enough
to fully penetrate structural framing or
wood structural panels and structural
framing a minimum of 1 inch.
Minimum hot-dipped galvanized nail
with a full round head is required, ring
shank fasteners are recommended.
Trim must be fastened with two nails
at both ends, with additional fasteners
spaced a maximum of 24 inches o.c.
along the length of the board.
FLASHING:
Flashing is required to protect the top
edge of trim from weather.
It's recommended to ash along the top
of trim utilizing a bendable head ashing
such as ASTRO Flashing, or similar.
(go
to: astroplastics.com/products/astro-ashing/)
Follow all head ashing manufactures
installation guidelines.
All ashing materials should have
a minimum 4 inch upper leg. Add a
minimum 4 inch wide adhesive ashing
to ashing legs less than 4 inches.
When integrating ashing with a water-
resistive barrier (WRB), be sure to follow
the WRB installation instructions.
FINISHING:
Install siding around the Diamond Kote
®
Arched Trim leaving the proper gap,
and sealing joints as required by the
manufacturer.
ROSETTES
FASTENING PLACEMENT:
Fasten Rosettes with a minimum of 2
fasteners placed at alternating edges
3/8" from ends and edges.
FASTENER TYPE:
Fastener length needs to be long enough
to fully penetrate structural framing or
wood structural panels and structural
framing a minimum of 1 inch.
Minimum hot-dipped galvanized nail
with a full round head is required, ring
shank fasteners are recommended.
3/8”
3/8”
3/8”
3/8”
3/8"
3/8"
3/8"
3/8"