Installation Guide

Instructions for 90" Tall Cabinet Installation
Remove base board and other objects on
the wall area where the cabinets are to be
installed. Using a straight edge and a level,
find the high spot in the floor where the
cabinets are to be installed. From the high
spot, mark a level horizontal line on each
wall where the cabinets will be attached.
From the level lines mark another parallel
level horizontal line 35" up for base and
90" up for tall and wall cabinets.
The top of the base, tall and wall
cabinets will be located at these marks.
Stand 90" tall cabinet upright near desired
installation locaton. Position the toe kick
assembly with toe kick board in front.
Slide toe kick assembly underneath tall cabinet.
(Note: a piece of 1/4" material can be placed
on top of toe kick assembly panel to aide
in sliding toe kick assembly underneath the tall
cabinet.) Align right, left and back sides of
toe kick assembly flush with cabinet.
Locate the studs with a studfinder and mark
where the cabinets are to be installed.
Remove all the doors and drawers from the
cabinets before installation.
STEP 1
STEP 2
STEP 3
Mark top line
for wall, tall
cabinets
Plumb
line
Corner is out
of plumb
(not vertical)
Corner is out
of plumb
Floor not level
High point
Use level to
draw line
Level, straight edge
Parts Included:
86" Cabinet
4" Toe Kick Assembly
8 #10 x 2 1/2" Screws
Parts Needed:
#6 x 2 1/2" Screws
10/30/08 KC5072 R1
Note: The use of nails in the installation of this cabinet voids all guarantees, written or implied.
Tools Needed:
Phillips Head Screwdriver
#2 Phillips Bit
Drill with 1/16" & 3/32" Bit
Marking Tool
Level
Studfinder
C-clamps
Tape Measure

Summary of content (3 pages)