Blind Corner Base Cabinet Install Instructions

(6.18.13) SCB INSTRUCTIONS A5131
STEP 14
After the two cabinets are mounted to the wall,
use clamps to clamp the cabinet face frames
together firmly. Be careful to line up the bottom
horizontal edges. With a 3/32" drill bit, drill
starter holes through the face frames near the
top and bottom. Insert and tighten the screws.
These screws will need to be purchased
separately; a #8 x 2 1/2" is recommended.
Check cabinet with a level on the cabinet front,
sides, and bottom. Shim where necessary.
Once the cabinet is level and plumb, tighten all
the installation screws and remove the clamps.
Shims