User manual

Software Installation 29
Installing Download
Cycle the T1 Modem Bank’s power off, then on again to restart POST. After a brief pause, the lights on the display
panel will flash, and the T1 Modem Bank will begin the POST sequence, which takes about 2 minutes to complete.
Once the POST is completed, P1 will be shown on the display panel to indicate that the T1 Modem Bank is ready
for download. (If P1 is not shown, go to the section “POST Failure” on page 30 for instructions.)
P2
indicates that the PING signal has been received; P3 will flash briefly on the screen, indicating that the download
has started. P4 indicates that a download is underway. At the same time, the LEDs will blink as packets are counted.
The following sequence appears on the display panel: PE, D0, C1, C2, C3, C4. When the download is received and
if the checksum has been validated, AC is then shown in the display, indicating that the T1 Modem Bank has been
programmed, FEP is running, and the T1 Modem Bank is on-line. At this point, go to either “Software Installation
for Novell Systems” on page 34 or “Software Installation for Windows NT Systems” on page 38.