User`s guide
2
Unpacking and Installation Instructions
This chapter describes the site preparation, unpacking, installation, and power-up
procedures for the SW300-series redundant array of independent disks (RAID)
enclosure.
2.1 Site Preparation
SW300-series enclosures are intended for installation in Federal Communications
Commission (FCC) Class A environments. Before installing the SW300 enclosure,
make sure adequate space is provided around the enclosure for opening the front
door and for adequate airflow. See Figure 2–1 for specific space requirements.
Figure 2–1 Minimum Installation Clearance Measurements
482.60 mm
(19.00 in)
476.25 mm
(18.34 in)
482.60mm
(19.00 in)
CXO-4316A-MC
FRONT
DOOR
SW300
2.2 Unpacking the SW300 Enclosure
SW300-series enclosures are packed in a corrugated carton attached to a wooden
shipping pallet, as shown in Figure 2–2. Unpack the SW300 enclosure as follows:
Note
Before unpacking the equipment, inspect the shipping carton for signs
of external damage. Report any damage to the local carrier and to
Multivendor Customer Services or your local Digital sales office.
Unpacking and Installation Instructions 2–1