User`s guide

L
Loading sequence
controller, 3–3
storage device SBBs, 3–3
M
Manufacturer’s Declarations, ix
P
Placing the SW300, 2–4
Power
applying, 2–5
Power configurations, 3–2
Power cords, 2–4
Power supply SBBs
description, 1–10
fault notification, 4–7
installation, 5–2
LEDs, 4–7
redundancy, 1–10
removal, 5–1
R
RAID
controller, 3–3
Recommended environmental limit, 1–3
Redundancy
power supply SBBs, 1–10
system, 3–1
Removal
AC power entry controller, 5–9
controller, 5–6
dual speed blower, 5–7
environmental monitor unit, 5–6
power supply SBBs, 5–1
storage device SBBs, 5–3
SW300 from pallet, 2–3
S
SBB
warm swap, 5–2
SCSI buses, 1–13, 3–2
Site preparation, 2–1
Specifications, 1–3
Storage device SBBs
description, 1–11
fault notification, 4–6
installation, 5–5
LEDs, 4–6
loading sequence, 3–3
removal, 5–3
SW300
loading sequence, 3–3
overview, 1–1
placing of, 2–4
recommended environmental limit, 1–3
redundancy, 3–1
removal from pallet, 2–3
SCSI buses, 1–13, 3–2
specifications, 1–3
SW300 front panel
error codes, 4–1
fault notification, 4–1
LEDs, 4–1
System configurations, 3–1
U
Unpacking the SW300, 2–1
W
Warm swap
SBB, 5–2
Index–2