User`s guide

Measure cabinet capacities by the number of individual shelves that can be
installed into the cabinet (for example, BA350–SB storage shelves).
Abide by the cabinet-specific installation sequence to maintain gravitational
stability. Failure to follow the sequence may result in tipping over the
cabinet.
Shelf configuration rules apply to all cabinets unless otherwise noted. Shelf-
specific configuration rules are in the StorageWorks Solutions Shelf and SBB
Users Guide and in Chapter 3 of this manual.
Switch-controlled input power is required for each shelf.
Bulkhead input/output (I/O) connections for the shelves, the host computer,
and/or external controllers are provided.
An SW800-series data center cabinet or an SW500-series cabinet does not
typically support dc power modules.
Input power can be either 60 Hz or 50 Hz with the appropriate cabinet cable
distribution unit (SW800–AA or SW800–AB, and SW500–AA or SW500–AB).
For the controller and storage shelves, a second cable distribution unit (CDU)
is required to support more than a single power supply per shelf.
4.6 Installation Instructions for Preconfigured and CTO
Subsystems
Installing a preconfigured or CTO HS array controller subsystem requires that
you follow the guidelines and procedures discussed in this section.
Preconfigured and CTO subsystems have all subsystem components preinstalled
(controller modules, cache modules, SCSI–2 device cables, storage shelves,
devices, power supplies, and so forth) except for the host port cables (for HSD30
and HSZ array controllers).
Note
Internal host port cables are included with HSJ array controllers.
(External CI cables must be ordered separately.) Host port cables must be
ordered separately for HSD30 and HSZ array controllers.
Therefore, you need to do only the following:
1. Unpack the subsystem and move it into place. Refer to cabinet-specific
installation guides for unpacking instructions.
2. Open the front and back doors of the cabinet.
3. Visually inspect all subsystem components to determine whether:
All cables are seated properly
All SBBs are seated properly
All controller and cache modules are seated properly
All shelf fans are seated properly
All program cards are loaded properly
4–14 Installation