Installation Guide
Table Of Contents
InstallatIon
Digital Monitoring Products
2
Installation
4.1 Location Information
A location should be selected that is centrally located between the 1100 Series transmitters used in the
installation.PlacetheEM20awayfrommetalobjects.PlacingtheEM20onornearmetalsurfacesimpairs
performance.
Primary Power Supply
5.1 AC Power Supply
1. Unpackthe16.5VACpowersupplyandfullyunrollthecord.
2. ConnectthepowersupplytotheRedRJ22connectiononthebackoftheEM20.
3. Connect the power supply to a 120VAC outlet not controlled by a switch and
secure with the screw provided.
Secondary Power Supply
6.1 Standby Battery
Install the Battery
Observe polarity when connecting battery. Ensure the
battery harness connectors are fully inserted to prevent
shorting.
1. TurntheEM20overandremovebatterycover.
2. The new battery comes with the harness pre-installed.
3. Connect the new battery harness to the locking 4-pin header
battery connector inside the battery compartment. Because the
headeriskeyed,itcanonlybeinstalledinonedirection.
4. Re-installthebatterycoverandturntheEM20upright.
6.2 Battery Supervision
TheEM20teststhebatteryonceeveryhourwhenACpowerispresent.
Thistestoccurs15minutespasteachhourandlastsforveseconds.
A load is placed on the battery and if the battery voltage falls below
11.9V, a low battery is detected.IfDCpowerhasfailed,alowbatteryis
detectedanytimethebatteryvoltagefallsbelow11.9V.
Figure 3: Step 2 & 3.
Figure 2: Step 1.
Figure 4: Step 4.