Operating instructions

G3 Series Description of menu
Description of menu
5-13
000015,031,02-2009, jmu
5
Correct X
When a centre alignment is carried out, the cuts are moved towards the coordinate
system centre until the cut and the coordinate system are congruent.
Measure and calculate distance b (mm/in) (penetration point line 1 to penetration
point line 2) of the parallel cuts to the X axis as follows:
⇨Start the
Test cut
1-1-1-4-4 function
Enter the calculated value X1 in the
Correct X
1-1-1-4-2 field
Perform a test cut and recalculate the correction value if necessary
The centre alignment is complete when both penetration points are precisely in
the centre (tolerance: ± 0.1 mm). Where necessary, check this using a
magnifying glass
2262
1-1-1-4-5 Test tool rotation
Automatic ini tialisation wit h AKIMove to a free point and press OK in order to start the test cu t.Test cut running...
Test cut for the alignment of the T axis. Description to follow
1903
1-1-1-4-6 Cut polygon test
Automatic ini tialisation wit h AKIMove to a free point and press OK in order to start the test cu t.Test cut running...
Test cut in the shape of an octagon. Description to follow.
1902
1-1-1-4-7 Cut rectangle test
Automatic ini tialisation wit h AKI
Move to a free point and press OK in order to start the test cu t.Test cut running...
Description to follow
2640
1-1-1-5 Router 1
No help text is available fo r this menu.
Router 1
2651
1-1-1-5 Router 2
No help text is available fo r this menu.
Router 2
1854
1-1-1-6 T-75 module
No help text is available fo r this menu.
Option 1: The distance between the
penetration points is greater than the
distance between the ends of the
cuts
X1=X2-b/2
Option 2: The distance between the
penetration points is smaller than the
distance between the ends of the
cuts
X1=X2+b/2
Result:
The penetration points are positioned
precisely in the centre
b...Distance in mm [in]
X1...calculated value
X2...current value from
Correct X
1-1-1-4-2