Technical data

5.4 Removal/Replacement Procedures
The following sections provide the specific removal/replacement procedures for the TSZ07.
These procedures are intended for use by qualified technicians who are thoroughly familiar
with the tape drive. Therefore, it is assumed that technicians know whether the drive needs to
be placed in the operator access position or the service access position to perform a particular
removal and replacement procedure. Procedures for placing the drive in the operator and
service positions are provided in Section 5.2 and Section 5.3 respectively.
5.4.1 Blower (P/N 29-28465-01)
To remove the blower, see Figure 5–4 and proceed as follows:
1. Disconnect the blower motor connector from the power supply cable.
2. Remove the three screws securing the blower to the plenum .
To replace the blower, follow the removal procedure in reverse order.
5–10 Removal/Replacement Procedures