Installation Guide

E-Z Connect
®
Professional Landscape Edging
Installation Guidelines
Using a straight edge spade, make a trench along the bed
area where edging is to be installed Trench should be
approximately 4” deep, depending on desired finished
edging height.
Slide spike-anchoring adaptors into track system prior to
connecting pieces. Recommended spike placement is a
maximum distance of 32” apart. Plan to use extra adaptors
at or near curves or for additional support when holding back
heavier types of decorative stone.
Slide connectors into track system with locking pegs facing
toward pre-drilled holes on each edging piece. Locking pegs
should click into pre-drilled holes on each of the edging
pieces, providing a clean, locked joint without overlapping.
Place edging in the trench with the track groove toward the
planting bed. Note that installers may find it easier to
connect all pieces before placing edging in trench.
Drive spikes vertically, through loops on spike adaptor until
spike head is against the adaptor. Recommended spike
placement is a maximum distance of 24” apart. Use extra
spikes at or near curves or for extra support when holding
back heavier types of decorative stone.
Tightly pack soil around edging and install landscape fabric
and ground cover (decorative stone, mulch, etc.) to the top of
the edging.
Dimex LLC » 28305 State Route 7 » Marietta, OH 45750 » 800.334.3776 » www.ezconnectedging.com

Summary of content (1 pages)