Owner`s manual

16
Suction ring component replacement
In accordance with the "ball valve maintenance steps"
to unload the upper and lower ball valve.
Suction component will be below the two-position
rotary nut removed.
Suction tube components will be slightly shelland pulled
down so that the shell about 1.5 cm from the equipment.
From the field in the suction components will be
introducedslowly shell straight Plunger rod to the
crankshaft andconnecting rod of the bottom of the
T-mount separation.
Will be down from the suction plunger rod components from the shell launched.
Suction components shell will be fixed on the nuts and locator removed.Will be removed
within the shell on the three ring .
Cleaning suction components shell will be installed with new white ring back Shell.
(Installation of the order and direction of making reference to the following diagram).
Note: new suction equipment manufactured components for the black ring ,and
suction component repair packet ring is white .
密封安装方向 部密圈安方向
O密封装时应将上部 O封圈在安装下部
封圈起面朝下 密封上的凸起朝上
Carefully check plunger rod, if wear or scratches, need immediate replacement.
Will be loaded back on the ball valve and plunger rod screwed tightly .
Note: this link can be used on the crankshaft T-type card which be screwed tightly onto
the piston rod fixation.
Will be embedded in the upper locator nut fixed, and fixed equipment to suction nut shell
components, the manpower to hand rotation.