Owner`s manual
8
3. the initial use of new equipment:
the new equipment of the factory contain a protective effect lubricants,so
the initial use of new equipment need to join the clean water of few soap to
take in to clean ,the flollowing step is cleaning:
⑴add to suction tube containing a little soapy water in the buckets
⑵add to the waste will be returned in the paint barrels\buckets.
(3)return valve will be installed in the vertical direction .
(4)open equipment power switch..
(5)let soapy water to peration equipment in the equipment within the circle ,until the
outflow of clean water from the return tube .
II preparetive before spraying:
before spraying ,they must first determine spray paint has been good
and have been initially harmonic filtering ,otherwise undesirable coating
equipment will in creas wear and reduce the life span of equipment .in
addition ,each time before spraying ,the paint must be used by delicated
diluent (such as spraying latex paint water can be used )to allow equipment
to cycle again and again spraying ,the following is operation steps:
⑴add suction tube will be fitted with special diluent or clean in the bucket.
⑵add to the waste will be returned in paint bucket.
⑶Pressure control buttons will be set in the middle (yellow areas) but the bottom
of the location of equipment functioning.
⑷return valve will be installed in the vertical direction.
⑸Power equipment opened.
⑹equipment to operation 15 to 30 seconds until the clean diluent from the outflow
of return
⑺shut the powers switch.
⑻set the reflux valve to the position of level.
⑼turn on the power switch