Installation Guide

PLEASE READ ALL INSTRUCTIONS CAREFULLY BEFORE YOU BEGIN INSTALLATION.
IMPROPER INSTALLATION WILL VOID WARRANTY.
Always check flooring panels for defects such as chips and color variations under good light
conditions prior to installation. Also check that grooves are free of debris.
Use laminate panels from multiple boxes during installation.
Laminate flooring MUST be allowed to acclimate to the temperature and humidity of
the room. Leave the closed package in a horizontal position for at least 48 hours prior
to installation. Preferred temperature should be 62-73oF (17-23oC) with relative
humidity of 40-60%. Humidity should never drop below 30% as gapping may occur.
If existing baseboard molding is difficult to remove, Quarter Round molding will be
required to cover the expansion space need between flooring and baseboard.
www.designispersonal.com

Summary of content (6 pages)