Specifications
PN 718113AF
17
Laser Induced Fluorescence Detection
Operation
Operation
Preparation
WARNING
Make sure the laser fiber optic cable and interlock devices are connected to the
LIF Detector before turning on power to the instrument or the laser. If the
interlock is defeated, laser light could be accessible in the interior or emitted from
the fiber optic cable.
1
Follow the instructions described in the Installation section before proceeding with step 2.
2
Turn on the instrument.
3
Turn on the laser. After the laser lights, wait at least 15 minutes for the laser output to stabilize.
NOTE
For instructions on operating the instrument from 32 Karat software, see the
P/ACE MDQ User’s Guide.