User manual

1200 Series Variable Wavelength Detector User Manual 33
Installing the Detector 3
Installing the Detector
1 Install the LAN interface board in the detector (if required), see “Replacing
the Interface Board" on page 99.
2 Place the detector in the stack or on the bench in a horizontal position.
3 Ensure the line power switch at the front of the detector is OFF.
Preparations Locate bench space.
Provide power connections.
Unpack the detector.
Parts required Detector
Power cord, for other cables see text below and “" on page 118
ChemStation and/or Control Module G1323B
Figure 7 Front View of Detector
Line power switch
with green light
Status indicator
green/yellow/red
NOTE
The figure above shows the flow cell already installed. The flow cell area is closed with a
metal cover. The flow cell has to be installed as described in “Flow Connections to the
Detector" on page 36.