User manual

38 1200 Series Variable Wavelength Detector User Manual
3 Installing the Detector
7 Establish a flow and observe for leakage. 8 Replace the front cover.
The installation of the detector is now complete.
NOTE
The detector should be operated with the front cover in place to protect the flow cell area
against strong drafts from the outside.