Operator`s manual
Table Of Contents
- Dionex ICS-1100 Ion Chromatography System Operator’s Manual
- Contents
- 1 • Introduction
- 2 • Features
- 3 • Operation and Maintenance
- 3.1 Operation Overview
- 3.2 Turning On the System Power
- 3.3 Connecting to Chromeleon
- 3.4 Set Up the Eluent Reservoir
- 3.5 Check All Connections
- 3.6 Prime the Pump
- 3.7 Set System Operating Conditions
- 3.8 Equilibrate the System and Verify Operational Status
- 3.9 Prepare Samples
- 3.10 Loading and Injecting Samples
- 3.11 Processing Samples
- 3.12 Maintenance
- 4 • Troubleshooting
- 4.1 Error Messages
- 4.2 Troubleshooting Error Messages
- 4.3 Liquid Leaks
- 4.4 Pump Difficult to Prime or Loses Prime
- 4.5 Pump Does Not Start
- 4.6 No Flow
- 4.7 Erratic Flow/Pressure Reading
- 4.8 Excessive System Backpressure
- 4.9 Peak “Ghosting”
- 4.10 Nonreproducible Peak Height or Retention Time
- 4.11 Abnormal Retention Time or Selectivity
- 4.12 No Cell Response
- 4.13 High Cell Output
- 4.14 Baseline Noise or Drift
- 4.15 Vacuum Degas Assembly Does Not Run
- 5 • Service
- 5.1 Diagnostic and Calibration Procedures
- 5.2 Isolating a Restriction in the Liquid Lines
- 5.3 Replacing Tubing and Fittings
- 5.4 Rebuilding the Injection Valve or Auxiliary Valve
- 5.5 Replacing an Auxiliary Valve Pod
- 5.6 Cleaning and Replacing the Pump Check Valves
- 5.7 Replacing a Pump Piston Seal and Piston Rinse Seal
- 5.8 Replacing a Pump Piston
- 5.9 Replacing the Waste Valve or Priming Valve O-Ring
- 5.10 Replacing the Conductivity Cell
- 5.11 Replacing the Suppressor
- 5.12 Replacing the Column Heater
- 5.13 Replacing the Column Heater Heat Exchanger
- 5.14 Replacing the Eluent Valve
- 5.15 Replacing the Leak Sensor
- 5.16 Priming the Pump
- 5.17 Priming the Pump with Isopropyl Alcohol
- 5.18 Changing Main Power Fuses
- A • Specifications
- A.1 Electrical
- A.2 Physical
- A.3 Environmental
- A.4 Front Panel
- A.5 Analytical Pump and Fluidics
- A.6 Eluent Regeneration
- A.7 Detector Electronics
- A.8 Conductivity Cell with Heat Exchanger
- A.9 Injection Valve
- A.10 Auxiliary Valve (Optional)
- A.11 Vacuum Degas Assembly (Optional)
- A.12 Column Heater (Optional)
- A.13 Suppressors
- A.14 Autosampler
- A.15 System Software
- B • TTL and Relay Control
- C • Reordering Information
- D • FAQ
- D.1 How do I hook up an autosampler?
- D.2 How do I print?
- D.3 Why are the retention times moving?
- D.4 How do I adjust retention times?
- D.5 When should I remake standards?
- D.6 When should I remake eluents?
- D.7 How do I start Chromeleon?
- D.8 How do I delete data?
- D.9 How do I back up data?
- D.10 How do I shut off the system?
- D.11 How do I store columns?
- D.12 How do I know when a column is dirty?
- D.13 How do I clean a column?
- D.14 Why is the conductivity high?
- D.15 How do I configure and operate the auxiliary valve?
- E • Glossary
- Index

Dionex ICS-1100 Ion Chromatography System
90 Doc. 065289-03 10/12
5.3 Replacing Tubing and Fittings
The Dionex ICS-1100 is plumbed with the tubing and tubing assemblies listed
below.
• The ER Tubing Kit (P/N 070061) contains the four pieces of tubing required
for connections from the RFIC-ER columns to the component panel. This
tubing is initially installed in the Dionex ICS-1100 at the factory.
• 10-32 fittings (P/N 043275) and ferrules (P/N 043276) are used for most
tubing connections. For tightening requirements, refer to Installation of
Dionex Liquid Line Fittings (Document No. 031432). The manual is included
on the Thermo Scientific Reference Library DVD (P/N 053891).
• 1/8-in fittings (P/N 052267) and ferrules (P/N 048949) are used for
connections to the suppressor
REGEN OUT port and the eluent reservoir.
Tubing Size and Type Color Used For
0.125-mm (0.005-in) ID PEEK
(P/N 044221)
Red Connection from pump pulse damper
to pressure transducer
0.25-mm (0.010-in) ID PEEK
(P/N 042690)
Black Connections between other system
components
0.50-mm (0.020-in) ID PEEK
(P/N 042855)
Orange Connection from injection port to
injection valve
0.75-mm (0.030-in) ID PEEK
(P/N 044777)
Green Connection from injection valve to
waste
1.58-mm (0.062-in) ID PTFE
(P/N 014157)
Clear Connection from pump to degas or
eluent reservoir; pump waste
25 L sample loop
(P/N 042857)
Orange Connection between ports
L (1) and
L (4) on the injection valve