Operator`s manual
Table Of Contents
- Dionex ICS-1100 Ion Chromatography System Operator’s Manual
- Contents
- 1 • Introduction
- 2 • Features
- 3 • Operation and Maintenance
- 3.1 Operation Overview
- 3.2 Turning On the System Power
- 3.3 Connecting to Chromeleon
- 3.4 Set Up the Eluent Reservoir
- 3.5 Check All Connections
- 3.6 Prime the Pump
- 3.7 Set System Operating Conditions
- 3.8 Equilibrate the System and Verify Operational Status
- 3.9 Prepare Samples
- 3.10 Loading and Injecting Samples
- 3.11 Processing Samples
- 3.12 Maintenance
- 4 • Troubleshooting
- 4.1 Error Messages
- 4.2 Troubleshooting Error Messages
- 4.3 Liquid Leaks
- 4.4 Pump Difficult to Prime or Loses Prime
- 4.5 Pump Does Not Start
- 4.6 No Flow
- 4.7 Erratic Flow/Pressure Reading
- 4.8 Excessive System Backpressure
- 4.9 Peak “Ghosting”
- 4.10 Nonreproducible Peak Height or Retention Time
- 4.11 Abnormal Retention Time or Selectivity
- 4.12 No Cell Response
- 4.13 High Cell Output
- 4.14 Baseline Noise or Drift
- 4.15 Vacuum Degas Assembly Does Not Run
- 5 • Service
- 5.1 Diagnostic and Calibration Procedures
- 5.2 Isolating a Restriction in the Liquid Lines
- 5.3 Replacing Tubing and Fittings
- 5.4 Rebuilding the Injection Valve or Auxiliary Valve
- 5.5 Replacing an Auxiliary Valve Pod
- 5.6 Cleaning and Replacing the Pump Check Valves
- 5.7 Replacing a Pump Piston Seal and Piston Rinse Seal
- 5.8 Replacing a Pump Piston
- 5.9 Replacing the Waste Valve or Priming Valve O-Ring
- 5.10 Replacing the Conductivity Cell
- 5.11 Replacing the Suppressor
- 5.12 Replacing the Column Heater
- 5.13 Replacing the Column Heater Heat Exchanger
- 5.14 Replacing the Eluent Valve
- 5.15 Replacing the Leak Sensor
- 5.16 Priming the Pump
- 5.17 Priming the Pump with Isopropyl Alcohol
- 5.18 Changing Main Power Fuses
- A • Specifications
- A.1 Electrical
- A.2 Physical
- A.3 Environmental
- A.4 Front Panel
- A.5 Analytical Pump and Fluidics
- A.6 Eluent Regeneration
- A.7 Detector Electronics
- A.8 Conductivity Cell with Heat Exchanger
- A.9 Injection Valve
- A.10 Auxiliary Valve (Optional)
- A.11 Vacuum Degas Assembly (Optional)
- A.12 Column Heater (Optional)
- A.13 Suppressors
- A.14 Autosampler
- A.15 System Software
- B • TTL and Relay Control
- C • Reordering Information
- D • FAQ
- D.1 How do I hook up an autosampler?
- D.2 How do I print?
- D.3 Why are the retention times moving?
- D.4 How do I adjust retention times?
- D.5 When should I remake standards?
- D.6 When should I remake eluents?
- D.7 How do I start Chromeleon?
- D.8 How do I delete data?
- D.9 How do I back up data?
- D.10 How do I shut off the system?
- D.11 How do I store columns?
- D.12 How do I know when a column is dirty?
- D.13 How do I clean a column?
- D.14 Why is the conductivity high?
- D.15 How do I configure and operate the auxiliary valve?
- E • Glossary
- Index

5•Service
Doc. 065289-03 10/12 105
5. Slide the new cell assembly straight into the opening in the component panel
until it stops and the cell cover is flush against the component panel. The
cell’s electronic connector automatically plugs into a connector inside the
Dionex ICS-1100 when you push the assembly into the opening.
6. Tighten the screws on the cell front cover fingertight.
7. Close the side panel door and tighten the two mounting screws.
8. Reconnect the inlet and outlet lines.
9. Turn on the Dionex ICS-1100 power.
10. Calibrate the new cell in Chromeleon. Calibration of a new cell consists of
three parts:
• Running the offset calibration, which measures the output of the cell
electronics alone and determines an offset value to be applied to raw
conductivity readings.
• Running the slope calibration, which measures the output of the cell
electronics when a built-in dummy cell, which provides a constant
conductivity reading of 21
S, is automatically enabled. The slope value
is applied to raw conductivity readings.
• Entering the cell constant measured at the factory. The Dionex ICS-1100
uses the cell constant to determine the measured conductivity.
a. Open the Wellness Panel (see Section 5.1.1
)
b. Under Electric Conductivity Cell Calibration, click Offset Cal.
c. When the offset calibration is complete, click Slope Cal.
d. Click Calibration Details. Under Conductivity Cell Cal Details, enter
the Cell Constant value printed on the front of the cell.
e. In the field next to the Download button, verify that Current is selected
and then click Download to download the new value to the Dionex ICS-
1100.
f. To ensure that the new values are recorded in the Dionex ICS-1100
memory, do not turn off the Dionex ICS-1100 power for at least 1 minute
after downloading.