Operator`s manual
Table Of Contents
- Dionex ICS-1100 Ion Chromatography System Operator’s Manual
- Contents
- 1 • Introduction
- 2 • Features
- 3 • Operation and Maintenance
- 3.1 Operation Overview
- 3.2 Turning On the System Power
- 3.3 Connecting to Chromeleon
- 3.4 Set Up the Eluent Reservoir
- 3.5 Check All Connections
- 3.6 Prime the Pump
- 3.7 Set System Operating Conditions
- 3.8 Equilibrate the System and Verify Operational Status
- 3.9 Prepare Samples
- 3.10 Loading and Injecting Samples
- 3.11 Processing Samples
- 3.12 Maintenance
- 4 • Troubleshooting
- 4.1 Error Messages
- 4.2 Troubleshooting Error Messages
- 4.3 Liquid Leaks
- 4.4 Pump Difficult to Prime or Loses Prime
- 4.5 Pump Does Not Start
- 4.6 No Flow
- 4.7 Erratic Flow/Pressure Reading
- 4.8 Excessive System Backpressure
- 4.9 Peak “Ghosting”
- 4.10 Nonreproducible Peak Height or Retention Time
- 4.11 Abnormal Retention Time or Selectivity
- 4.12 No Cell Response
- 4.13 High Cell Output
- 4.14 Baseline Noise or Drift
- 4.15 Vacuum Degas Assembly Does Not Run
- 5 • Service
- 5.1 Diagnostic and Calibration Procedures
- 5.2 Isolating a Restriction in the Liquid Lines
- 5.3 Replacing Tubing and Fittings
- 5.4 Rebuilding the Injection Valve or Auxiliary Valve
- 5.5 Replacing an Auxiliary Valve Pod
- 5.6 Cleaning and Replacing the Pump Check Valves
- 5.7 Replacing a Pump Piston Seal and Piston Rinse Seal
- 5.8 Replacing a Pump Piston
- 5.9 Replacing the Waste Valve or Priming Valve O-Ring
- 5.10 Replacing the Conductivity Cell
- 5.11 Replacing the Suppressor
- 5.12 Replacing the Column Heater
- 5.13 Replacing the Column Heater Heat Exchanger
- 5.14 Replacing the Eluent Valve
- 5.15 Replacing the Leak Sensor
- 5.16 Priming the Pump
- 5.17 Priming the Pump with Isopropyl Alcohol
- 5.18 Changing Main Power Fuses
- A • Specifications
- A.1 Electrical
- A.2 Physical
- A.3 Environmental
- A.4 Front Panel
- A.5 Analytical Pump and Fluidics
- A.6 Eluent Regeneration
- A.7 Detector Electronics
- A.8 Conductivity Cell with Heat Exchanger
- A.9 Injection Valve
- A.10 Auxiliary Valve (Optional)
- A.11 Vacuum Degas Assembly (Optional)
- A.12 Column Heater (Optional)
- A.13 Suppressors
- A.14 Autosampler
- A.15 System Software
- B • TTL and Relay Control
- C • Reordering Information
- D • FAQ
- D.1 How do I hook up an autosampler?
- D.2 How do I print?
- D.3 Why are the retention times moving?
- D.4 How do I adjust retention times?
- D.5 When should I remake standards?
- D.6 When should I remake eluents?
- D.7 How do I start Chromeleon?
- D.8 How do I delete data?
- D.9 How do I back up data?
- D.10 How do I shut off the system?
- D.11 How do I store columns?
- D.12 How do I know when a column is dirty?
- D.13 How do I clean a column?
- D.14 Why is the conductivity high?
- D.15 How do I configure and operate the auxiliary valve?
- E • Glossary
- Index

5•Service
Doc. 065289-03 10/12 111
6. Pull the valve straight out from the
component panel and begin pulling
the attached cable out of the opening
in the panel.
7. The cable is connected to a
matching cable inside the Dionex
ICS-1100. Continue pulling until the
connectors for the two cables are
outside the panel (see Figure 5-19
).
Disconnect the cables.
Figure 5-19. Eluent Valve Cable
8. Remove the mounting plate on the
old valve by unscrewing and
removing the two screws. Save the
screws.
9. Thread the cable from the new
eluent valve through the mounting
plate.
10. Attach the mounting plate to the
new valve using the screws
removed in Step 8
.
Figure 5-20. Removing the Eluent Valve Mounting Plate
11. Connect the cable from the new valve (P/N 057945) to the Dionex ICS-1100
cable. Feed the cables back inside the Dionex ICS-1100.
Eluent Valve
Cable
Disconnect
cables
Eluent Valve
Remove
screws