5.16.2 Priming with the Prime Button
NOTE Perform this procedure after priming the eluent
lines (see Section 5.16.1
).
1. Check that the priming valve on the primary pump head is closed (see
Figure 5-24
).
2. Open the waste valve on the secondary pump head by turning the
knob one-quarter to one-half turn counterclockwise (see Figure 5-24
).
Opening the valve directs the eluent flow path to waste and eliminates
backpressure.
3. In the Pump Settings window (see Figure 3-5
), click the Prime
button. Confirm that the waste valve is open by clicking OK when the
reminder message appears. The pump will begin pumping at about
3mL/min.
4. Continue priming the Dionex ICS-1100 until no air bubbles are
exiting the pump waste line.
5. In the Pump Settings window, click Pump Off.
6. Close the waste valve. Do not overtighten the valve.