Operator`s manual

Table Of Contents
Index
Doc. 065289-03 10/12 Index-3
Calibration, 122
Cell drive, 122
Control and data evaluation, 122
Linearity, 122
Range, 122
Resolution, 122
Temperature compensation, 122
Diagnostics, 81
Dimensions, 119
Dionex, 40
Direct software control, 25
Drip tray, 15
DS6 Heated Conductivity Cell
See Conductivity cell
Duty cycle, 27
E
Electrical specifications
Fuses, 119
Main power, 119
Eluent
Aqueous, 56, 71
Degassing, 26
Delivery process, 2
Filtering, 43
Preparing, 42
When to remake, 140
Eluent bottle
See Eluent reservoir
Eluent level, 43
Eluent reservoir
Connecting, 44
Monitoring liquid level in, 43
Storage on top cover, 13
Eluent valve, 16
Replacing, 110
End-line filter
See Filter, end-line
Environmental specifications, 120
Equilibration time, 46
ER Controller (ERC 10), 17, 35
Error messages, 61 – 67
Audit Trail description, 59
Column heater exceeds safe temperature,
61
Column heater open circuit, 61
Column heater short circuit, 61
Degas calibration failed, 61
Hardware not present, 62
Leak sensor wet, 62
Load/inject valve error, 62
Option not installed, 63
Pump motor lost control, 63
Pump over pressure, 64
Pump pressure hardware error, 64
Pump stopped due to lost USB
communication, 64
Pump under pressure, 65
Second valve error, 65
Suppressor not connected, 66
Suppressor over current, 66
Suppressor over power, 67
Suppressor stopped for zero flow rate, 67
F
Filter, end-line
Bacterial contamination, 56, 71
Dirty or clogged, 56, 71
Installation, 43
Fittings
Leaking, 68
Replacing, 90
Requirements, 90
Flow rate, 15, 120
Calibration, 86
Troubleshooting, 72
Flow schematics, 20
Front panel, 11
Fuses
Replacement procedure, 117
Requirements, 119