Operator`s manual

Table Of Contents
Index
Doc. 065289-03 10/12 Index-5
O
Offsetting background conductivity, 46
Operating features, 11
Operating humidity, 120
Operating ranges
Cell heater, 15
Column heater, 16
Flow rate, 15
Operating temperature, 120
Operation
Equilibration time, 46
Overview, 37
Priming, 45, 115 – 116
Reservoir setup, 42
Sample preparation, 47
Sample processing, 38
Setting operating conditions, 46
Starting Chromeleon, 40
System power-up, 39
Operational status verification, 46
Option not installed error, 63
Oven
See Column heater
Overview of system, 4
P
Panel tabset, 24
How to display, 25
Panels
Chromeleon Wellness panel, 81
Component panel, 14
Parameters
Chromeleon operating commands, 53
Peak ghosting, 74
Peak height
Reproducibility, 34
Troubleshooting, 75
Peaks
Extraneous (ghosting), 74
PEEK
Conductivity cell body, 34
PGM file
See Programs
Physical specifications
Decibel level, 119
Dimensions, 119
Weight, 119
Piston seals
Replacement procedure, 97 – 98
Pistons
Replacement procedure, 101
Plumbing
Injection valve, 92
Replacing tubing and fittings, 90
Troubleshooting, 87
Plumbing diagrams, 20
Power
Turning on, 39
Power cord, 117
Power receptacle, 19
Power requirements, 119
Power-up conditions, 39
Pressure
Limit, 65
System, 65
Pressure transducer, 15, 30
Leaking, 69
System backpressure, 30
Priming, 45, 113, 115 – 116
Pump is out of prime, 71
With a syringe, 113
With isopropyl alcohol, 116
With the Prime button, 115
Priming valve
Opening, 28
O-ring replacement procedure, 102
Printing, 139
Problems
See Troubleshooting
Processing samples, 38, 52 – 53
Automatically (batch), 38, 53 – 54
Manually, 38, 52
Product warranty, 81, 91 – 92
Programmed software control, 25