Operator`s manual

Table Of Contents
Dionex ICS-1100 Ion Chromatography System
Index-6 Doc. 065289-03 10/12
Programs (Chromeleon), 25
Controlling an autosampler, 51
Pulse damper, 20, 22, 30
Pump, 28
Flow rate, 15
Leaks, 68
Over pressure alarm, 64
Primary pump head, 28
Priming, 45, 113
Priming problems, 70
Secondary pump head, 29
Stopped due to lost USB communication,
64
Troubleshooting, 72
Under pressure alarm, 65
Pump check valve leaking, 68
Pump degas
See Vacuum degas assembly
Pump head waste valve
Leaking, 69
O-ring replacement procedure, 102
Pump heads, 95
Pump motor lost control alarm, 63
Pump pressure hardware error, 64
Pump priming valve
O-ring replacement procedure, 102
Pump specifications
Construction, 120
Delay volume, 120
Eluent bottle pressure, 120
Eluent generation, 120
Flow accuracy, 120
Flow precision, 120
Flow rate, 120
Gradient capabilities, 120
Operating pressure, 120
Pressure ripple, 120
Type, 120
Vacuum degasser, 120
Q
Quantification method, 55
R
Rear panel, 18
Analog output connector, 18
Power receptacle, 19
USB connections, 19
Rebuilding the auxiliary valve, 91
Rebuilding the injection valve, 91
Relay connections
Rear panel connector, 19, 129
Relay outputs
Controlling, 134
Voltage and current specifications, 130
Reordering information, 135
Reproducibility, 34
Reservoir
Connecting, 44
Monitoring liquid level in, 43
Storage on top cover, 13
Restriction in liquid lines, 64, 87
Retention time
Adjusting, 139
Moving, 139
Troubleshooting, 75
RFIC-ER compartment, 17
RFIC-ER Kits, 17
RFIC-ER mode
Components required, 17
Flow schematics, 20
Specifications, 122
Running samples, 52
See also Processing samples
S
Safety messages, 6
Sample loop, 15, 30 – 31
Changing, 90
Injecting, 31
Injection valve connections, 31, 91
Loading, 31
Reordering, 135