Operator`s manual
Table Of Contents
- Dionex ICS-1100 Ion Chromatography System Operator’s Manual
- Contents
- 1 • Introduction
- 2 • Features
- 3 • Operation and Maintenance
- 3.1 Operation Overview
- 3.2 Turning On the System Power
- 3.3 Connecting to Chromeleon
- 3.4 Set Up the Eluent Reservoir
- 3.5 Check All Connections
- 3.6 Prime the Pump
- 3.7 Set System Operating Conditions
- 3.8 Equilibrate the System and Verify Operational Status
- 3.9 Prepare Samples
- 3.10 Loading and Injecting Samples
- 3.11 Processing Samples
- 3.12 Maintenance
- 4 • Troubleshooting
- 4.1 Error Messages
- 4.2 Troubleshooting Error Messages
- 4.3 Liquid Leaks
- 4.4 Pump Difficult to Prime or Loses Prime
- 4.5 Pump Does Not Start
- 4.6 No Flow
- 4.7 Erratic Flow/Pressure Reading
- 4.8 Excessive System Backpressure
- 4.9 Peak “Ghosting”
- 4.10 Nonreproducible Peak Height or Retention Time
- 4.11 Abnormal Retention Time or Selectivity
- 4.12 No Cell Response
- 4.13 High Cell Output
- 4.14 Baseline Noise or Drift
- 4.15 Vacuum Degas Assembly Does Not Run
- 5 • Service
- 5.1 Diagnostic and Calibration Procedures
- 5.2 Isolating a Restriction in the Liquid Lines
- 5.3 Replacing Tubing and Fittings
- 5.4 Rebuilding the Injection Valve or Auxiliary Valve
- 5.5 Replacing an Auxiliary Valve Pod
- 5.6 Cleaning and Replacing the Pump Check Valves
- 5.7 Replacing a Pump Piston Seal and Piston Rinse Seal
- 5.8 Replacing a Pump Piston
- 5.9 Replacing the Waste Valve or Priming Valve O-Ring
- 5.10 Replacing the Conductivity Cell
- 5.11 Replacing the Suppressor
- 5.12 Replacing the Column Heater
- 5.13 Replacing the Column Heater Heat Exchanger
- 5.14 Replacing the Eluent Valve
- 5.15 Replacing the Leak Sensor
- 5.16 Priming the Pump
- 5.17 Priming the Pump with Isopropyl Alcohol
- 5.18 Changing Main Power Fuses
- A • Specifications
- A.1 Electrical
- A.2 Physical
- A.3 Environmental
- A.4 Front Panel
- A.5 Analytical Pump and Fluidics
- A.6 Eluent Regeneration
- A.7 Detector Electronics
- A.8 Conductivity Cell with Heat Exchanger
- A.9 Injection Valve
- A.10 Auxiliary Valve (Optional)
- A.11 Vacuum Degas Assembly (Optional)
- A.12 Column Heater (Optional)
- A.13 Suppressors
- A.14 Autosampler
- A.15 System Software
- B • TTL and Relay Control
- C • Reordering Information
- D • FAQ
- D.1 How do I hook up an autosampler?
- D.2 How do I print?
- D.3 Why are the retention times moving?
- D.4 How do I adjust retention times?
- D.5 When should I remake standards?
- D.6 When should I remake eluents?
- D.7 How do I start Chromeleon?
- D.8 How do I delete data?
- D.9 How do I back up data?
- D.10 How do I shut off the system?
- D.11 How do I store columns?
- D.12 How do I know when a column is dirty?
- D.13 How do I clean a column?
- D.14 Why is the conductivity high?
- D.15 How do I configure and operate the auxiliary valve?
- E • Glossary
- Index

Dionex ICS-1100 Ion Chromatography System
26 Doc. 065289-03 10/12
2.4 System Component Details
This section provides details about Dionex ICS-1100 system components,
including the vacuum degas assembly (optional), RFIC-ER components, eluent
valve, pump, injection valve, column heater (optional), suppressor, and
conductivity cell.
2.4.1 Vacuum Degas Assembly (Optional)
The vacuum degas assembly provides online eluent degassing at the time
and duration specified by the user. The assembly, which must be installed
in the Dionex ICS-1100 at the factory, consists of:
• A single-channel degas chamber (with degas membranes) with
internal capacity of 17 mL
• A dual-stage diaphragm vacuum pump
• A solenoid valve
• An on-board vacuum sensor
• The electronics required to operate the vacuum pump
• Tubing, fittings, and other accessories
By default, the Dionex ICS-1100 monitors the degas pressure reading and
turns the degas pump on and off as needed. Different degas operating
modes can be selected from Chromeleon.
To select the degas operating options, open the Chromeleon Server
Configuration program, right-click the Dionex ICS-1100 device in the
timebase, and select Properties.