Operator`s manual

Table Of Contents
3 Operation and Maintenance
Doc. 065289-03 10/12 45
3.6 Prime the Pump
1. Verify that the priming valve on the primary pump head (see Figure 3-6) is
closed (turned all the way clockwise).
2. Open the waste valve on the secondary pump head by turning the knob one-
quarter to one-half turn counterclockwise. Opening the valve directs the
eluent flow path to waste and eliminates backpressure.
3. Press
Prime on the Chromeleon Control panel. The pump will begin pumping
at approximately 3 mL/min.
4. Continue priming the Dionex ICS-1100 until all air and previous eluent are
purged and no air bubbles are exiting the waste line.
5. Press
Pump Off.
6. Close the waste valve. Do not overtighten. The pump is now ready for
operation.
If you changed eluent or if the eluent lines are dry, prime the lines first
with a syringe before following the procedure below to prime the
pump. See Section 5.16.1
for instructions on priming the lines with a
syringe.
Figure 3-6. Priming the Pump
Priming Valve
Waste Valve
Primary
Pump Head
Secondary
Pump Head
(open)
(close)