Operator`s manual
Table Of Contents
- Dionex ICS-1100 Ion Chromatography System Operator’s Manual
- Contents
- 1 • Introduction
- 2 • Features
- 3 • Operation and Maintenance
- 3.1 Operation Overview
- 3.2 Turning On the System Power
- 3.3 Connecting to Chromeleon
- 3.4 Set Up the Eluent Reservoir
- 3.5 Check All Connections
- 3.6 Prime the Pump
- 3.7 Set System Operating Conditions
- 3.8 Equilibrate the System and Verify Operational Status
- 3.9 Prepare Samples
- 3.10 Loading and Injecting Samples
- 3.11 Processing Samples
- 3.12 Maintenance
- 4 • Troubleshooting
- 4.1 Error Messages
- 4.2 Troubleshooting Error Messages
- 4.3 Liquid Leaks
- 4.4 Pump Difficult to Prime or Loses Prime
- 4.5 Pump Does Not Start
- 4.6 No Flow
- 4.7 Erratic Flow/Pressure Reading
- 4.8 Excessive System Backpressure
- 4.9 Peak “Ghosting”
- 4.10 Nonreproducible Peak Height or Retention Time
- 4.11 Abnormal Retention Time or Selectivity
- 4.12 No Cell Response
- 4.13 High Cell Output
- 4.14 Baseline Noise or Drift
- 4.15 Vacuum Degas Assembly Does Not Run
- 5 • Service
- 5.1 Diagnostic and Calibration Procedures
- 5.2 Isolating a Restriction in the Liquid Lines
- 5.3 Replacing Tubing and Fittings
- 5.4 Rebuilding the Injection Valve or Auxiliary Valve
- 5.5 Replacing an Auxiliary Valve Pod
- 5.6 Cleaning and Replacing the Pump Check Valves
- 5.7 Replacing a Pump Piston Seal and Piston Rinse Seal
- 5.8 Replacing a Pump Piston
- 5.9 Replacing the Waste Valve or Priming Valve O-Ring
- 5.10 Replacing the Conductivity Cell
- 5.11 Replacing the Suppressor
- 5.12 Replacing the Column Heater
- 5.13 Replacing the Column Heater Heat Exchanger
- 5.14 Replacing the Eluent Valve
- 5.15 Replacing the Leak Sensor
- 5.16 Priming the Pump
- 5.17 Priming the Pump with Isopropyl Alcohol
- 5.18 Changing Main Power Fuses
- A • Specifications
- A.1 Electrical
- A.2 Physical
- A.3 Environmental
- A.4 Front Panel
- A.5 Analytical Pump and Fluidics
- A.6 Eluent Regeneration
- A.7 Detector Electronics
- A.8 Conductivity Cell with Heat Exchanger
- A.9 Injection Valve
- A.10 Auxiliary Valve (Optional)
- A.11 Vacuum Degas Assembly (Optional)
- A.12 Column Heater (Optional)
- A.13 Suppressors
- A.14 Autosampler
- A.15 System Software
- B • TTL and Relay Control
- C • Reordering Information
- D • FAQ
- D.1 How do I hook up an autosampler?
- D.2 How do I print?
- D.3 Why are the retention times moving?
- D.4 How do I adjust retention times?
- D.5 When should I remake standards?
- D.6 When should I remake eluents?
- D.7 How do I start Chromeleon?
- D.8 How do I delete data?
- D.9 How do I back up data?
- D.10 How do I shut off the system?
- D.11 How do I store columns?
- D.12 How do I know when a column is dirty?
- D.13 How do I clean a column?
- D.14 Why is the conductivity high?
- D.15 How do I configure and operate the auxiliary valve?
- E • Glossary
- Index

Dionex ICS-1100 Ion Chromatography System
54 Doc. 065289-03 10/12
Summary of Automatic Sample Processing
1. Complete the instructions in Section 3.2 through Section 3.8 to
prepare the Dionex ICS-1100 for operation and to prepare the sample
for processing.
2. If an autosampler is installed, prepare and fill the sample vials and
place them in the autosampler tray or cassette. Refer to the
autosampler manual for detailed instructions. Autosampler manuals
are provided on the Thermo Scientific Reference Library DVD
(P/N 053891).
3. If an autosampler is not installed, load the sample into the injection
valve sample loop through the sample port on the Dionex ICS-1100
front door (see Section 3.10.1
).
4. Use the Application Wizard to specify a program and quantitation
method, and create a sequence:
a. On the Sequence Control panel, click Application Wizard.
b. Select an application template from the list (see Figure 3-8
).
Figure 3-8. Application Wizard