Operator`s manual
Table Of Contents
- Dionex ICS-1100 Ion Chromatography System Operator’s Manual
- Contents
- 1 • Introduction
- 2 • Features
- 3 • Operation and Maintenance
- 3.1 Operation Overview
- 3.2 Turning On the System Power
- 3.3 Connecting to Chromeleon
- 3.4 Set Up the Eluent Reservoir
- 3.5 Check All Connections
- 3.6 Prime the Pump
- 3.7 Set System Operating Conditions
- 3.8 Equilibrate the System and Verify Operational Status
- 3.9 Prepare Samples
- 3.10 Loading and Injecting Samples
- 3.11 Processing Samples
- 3.12 Maintenance
- 4 • Troubleshooting
- 4.1 Error Messages
- 4.2 Troubleshooting Error Messages
- 4.3 Liquid Leaks
- 4.4 Pump Difficult to Prime or Loses Prime
- 4.5 Pump Does Not Start
- 4.6 No Flow
- 4.7 Erratic Flow/Pressure Reading
- 4.8 Excessive System Backpressure
- 4.9 Peak “Ghosting”
- 4.10 Nonreproducible Peak Height or Retention Time
- 4.11 Abnormal Retention Time or Selectivity
- 4.12 No Cell Response
- 4.13 High Cell Output
- 4.14 Baseline Noise or Drift
- 4.15 Vacuum Degas Assembly Does Not Run
- 5 • Service
- 5.1 Diagnostic and Calibration Procedures
- 5.2 Isolating a Restriction in the Liquid Lines
- 5.3 Replacing Tubing and Fittings
- 5.4 Rebuilding the Injection Valve or Auxiliary Valve
- 5.5 Replacing an Auxiliary Valve Pod
- 5.6 Cleaning and Replacing the Pump Check Valves
- 5.7 Replacing a Pump Piston Seal and Piston Rinse Seal
- 5.8 Replacing a Pump Piston
- 5.9 Replacing the Waste Valve or Priming Valve O-Ring
- 5.10 Replacing the Conductivity Cell
- 5.11 Replacing the Suppressor
- 5.12 Replacing the Column Heater
- 5.13 Replacing the Column Heater Heat Exchanger
- 5.14 Replacing the Eluent Valve
- 5.15 Replacing the Leak Sensor
- 5.16 Priming the Pump
- 5.17 Priming the Pump with Isopropyl Alcohol
- 5.18 Changing Main Power Fuses
- A • Specifications
- A.1 Electrical
- A.2 Physical
- A.3 Environmental
- A.4 Front Panel
- A.5 Analytical Pump and Fluidics
- A.6 Eluent Regeneration
- A.7 Detector Electronics
- A.8 Conductivity Cell with Heat Exchanger
- A.9 Injection Valve
- A.10 Auxiliary Valve (Optional)
- A.11 Vacuum Degas Assembly (Optional)
- A.12 Column Heater (Optional)
- A.13 Suppressors
- A.14 Autosampler
- A.15 System Software
- B • TTL and Relay Control
- C • Reordering Information
- D • FAQ
- D.1 How do I hook up an autosampler?
- D.2 How do I print?
- D.3 Why are the retention times moving?
- D.4 How do I adjust retention times?
- D.5 When should I remake standards?
- D.6 When should I remake eluents?
- D.7 How do I start Chromeleon?
- D.8 How do I delete data?
- D.9 How do I back up data?
- D.10 How do I shut off the system?
- D.11 How do I store columns?
- D.12 How do I know when a column is dirty?
- D.13 How do I clean a column?
- D.14 Why is the conductivity high?
- D.15 How do I configure and operate the auxiliary valve?
- E • Glossary
- Index

5•Service
Doc. 065289-03 10/12 87
5.1.4 Calibrating the Vacuum Degas Assembly
When to Calibrate
• After every 6 months of use
1. Open the Dionex ICS-1100 Wellness Panel in Chromeleon (see
Section 5.1.1
).
2. On the Wellness Panel under Degas Calibration, select Calibrate.
The degas pump runs for 90 seconds to allow a vacuum to be created.
After 90 seconds, the vacuum degas pressure reading is recorded.
When the vacuum degas assembly is running in monitor mode, this
calibration value is used to determine when to turn on the degas
pump.
3. Click
Log to record the new calibration value in the Audit Trail.
5.2 Isolating a Restriction in the Liquid Lines
A restriction in the liquid plumbing will cause excessive system backpressure.
1. Begin pumping eluent through the system (including the columns).
2. Follow the flow schematics in Figure 5-2
or Figure 5-3 and work backward
through the system, beginning at the suppressor
Regen Out port. One at a
time, loosen each fitting and observe the pressure. The connection at which
the pressure drops abnormally indicates the point of restriction.
NOTE The numbers on the flow schematics indicate the order
in which liquid flows through the system components.
If the restriction has caused such high pressure that the system cannot be
operated, you must work forward through the flow schematic, adding parts
one at a time until an abnormal pressure increase (and hence, the restriction) is
found.
3. If the restriction is in the tubing or fitting, remove the restriction by back
flushing or by replacing the tubing or fitting (see Section 5.3
).