Specifications

© Systeme Lauer GmbH & Co KG • Kelterstr.59 • 72669 Unterensingen • Tel. (07022) 96 60-0 • Fax (07022) 96 60-103
D-1
D Buep 19e-Direct driverD Buep 19e-Direct driver
D1 First commissioning
Preface The successful parameterization of the PCS as described in the PCSPRO
manual is presupposed. This appendix relates exclusively to the use of
the PCS 900/950 together with the BOSCH PLC by means of the
BUEP19E protocol. In the following, this controller is referred to as PLC
and the driver to be loaded into the PCS as B19EDIR. The BOSCH specific
terminology and the programming of the PLC with the BOSCH software
are presupposed as known.
Attention!
Use only the software PCSPRO or PCSPRO
WIN
for programming. Other
software packages can release failures of the PCS and PLC.
Required devices and accessories The following products are required for the operation of a PLC with an
PCS (Systeme Lauer company):
1. PCS 900/920/950 operating console
2. The PCS 706 connecting cable for the PCS to PLC connection via
the TTY interface or a zero-modem cable for the connection via the
RS-232C interface
3. PCSPRO floppy disk with 5P90BUEP driver, version 2.4 or later
4. PCS 991/925/995 manual
5. PCS 91.BOS appendix including BOSCH handling software
6. Optionally: PG-MUX PCS 809.BOS for the simultaneous operation
of the programming unit and the PCS via one programming interface.
Furthermore are required (BOSCH company):
1. „PROFI“ software (version 3.3 or later), programming cable, and the
copy protection device for programming the PLC
2. CL500 rack (or other PLC supporting the BUEP19E protocol)
3. Power supply NT 3
4. Coordinator board SK 500
5. One or several ZS 500/501 CPU boards (with 32k or 64k RAM
module)
6. One or several I/O boards
7. Power supplies for the PCS console and Bosch I/O boards