Replacement Part List

2. Unpacking the Container (continued)
15
Step 5: Remove Tank & Engine Assembly from crate, then
remove the Beam & Cylinder Assembly. Lift Beam &
Cylinder Assembly to its vertical position standing on the
footplate.
For 28 Ton: Use a 13mm wrench or socket to remove the two
hex bolts that secure the Kohler engine to the crate
bottom (as shown below).