Installation Guide

9/10/2019 Installation Guide – Disruptive Technologies
https://support.disruptive-technologies.com/hc/en-us/articles/360003190014-Installation-Guide 11/22
Step 6: Verify device list in DT Studio
The last step is to open up the project you are currently installing in DT Studio and verify that all sensors are reporting and that
the signal strength for the whole installation is good.
If all sensors are reporting with no warnings or indications on the signal strength, the installation is complete. If one or more
sensors are in boost mode(
) or are not reporting ( ), go to troubleshooting.