Instruction Manual

Conduct a Bore - 110 JT2020 Mach 1 Operator’s Manual
Remove Pipe
CMW
9. Break rear joint.
Engage rear wrench.
Slowly rotate spindle counterclockwise until joint is loosened. Do not fully separate joint.
Disengage rear wrench.
Move carriage back until front end of pipe is positioned inside front end of pipe box.
Rotate spindle counterclockwise until saver sub is separated from pipe.
Stop rotation and move carriage to back of frame.
10. Ensure pipe box is positioned correctly.
11. Load pipe into pipe box:
12. Attach saver sub to next pipe.
Move carriage forward until saver sub touches pipe.
Rotate spindle to connect to pipe. Slowly tighten joint to full machine torque.
13. Disengage front wrench to release pipe.
Manual Pipeloader Controls Automated Pipeloader Control
Move shuttle under pipe box.
Release grippers and raise pipe lifters to
place pipe in box.
Lube front threads.
Press resume. Green control cycle light
will come on.
Shuttles will retract, front threads will be
lubed, grippers will release pipe, pipe
lifters will raise until pipe is off shuttles,
and then green control cycle light will
flash.