Instruction Manual

Controls - 28 JT2020 Mach 1 Operator’s Manual
Left Control Console
CMW
Item Description Notes
1. Add pipe/manual/
remove pipe switch
To select “add pipe”
automated pipeloader
function, press top.
To use manual pipeloader
controls, move to center.
To select “remove pipe”
automated pipeloader
function, press bottom.
See “Add Pipe” on page 102.
See “Remove Pipe” on page 109.
2. Set/Resume switch To resume operation or
increase operation levels,
press top.
To set operating conditions or
reduce operation levels,
press bottom.
See “Cruise Control” on page 146.
3. Pipe box switch To shift pipe box toward
operator, press left side.
To shift pipe box away from
operator, press right side.
IMPORTANT: See “Shift Pipe Box” on
page 141.
4. Resume switch To resume operation, press. See “Add Pipe” on page 102.
RESUME /
SET /
c00ic113h.eps