Planning
CMW
Planning
1. Gather information about jobsite. See page 65.
2. Inspect jobsite. See page 66.
3. Classify jobsite. See page 68.
4. Plan bore path. See page 71.
5. Check supplies and prepare equipment. See page 76.
6. Load equipment. See page 85.
Setting Up at Jobsite
1. Prepare jobsite. See page 76.
2. Unload drilling unit from trailer. See page 88.
3. Assemble drill string. See page 97.
4. Position drilling unit and drill frame. See page 93.
5. Assemble strike system. See page 116.
6. Anchor drilling unit. See page 115.
7. Connect fluid system. See page 93.
8. Calibrate tracker with beacon that will be installed in beacon housing. See tracker operator’s manual.