Instruction Manual

JT2020 Mach 1 Operator’s Manual Operation Overview - 61
Drilling
CMW
Drilling
1. Start system. See page 93.
2. Engage tracker control if desired. See page 127.
3. Drill first pipe. See page 100.
4. Record bore path. See page 105.
5. Enable automated pipeloader system. See page 105.
6. Add pipe. See page 102.
7. Drill remaining pipes in pipe box.
Correct direction. See page 104.
Engage cruise control. See page 146.
Shift pipe box. See page 141.
8. Add up to a single column of drill pipe to empty box (see page 141) to complete bore.
9. Surface drill head. See page 106.