Instruction Manual
JT2020 Mach 1 Operator’s Manual Prepare - 73
Plan Bore Path
CMW
Pipe-By-Pipe Bend Limits
Pipe
(C)
Forward (B) Deflection (A) Pipe
(C)
Forward (B) Deflection (A)
1 10 ft 0 in (3.0 m) 0 ft 5 in (0.1 m) 12 103 ft 8 in (31.6 m) 51 ft 7 in (15.7 m)
2 19 ft 11 in (6.1 m) 1 ft 6 in (0.5 m) 13 109 ft 5 in (33.3 m) 59 ft 9 in (18.2 m)
3 29 ft 9 in (9.1 m) 3 ft 5 in (1.1 m) 14 1114 ft 6 in (34.9 m) 68 ft 5 in (20.8 m)
4 39 ft 4 in (12.0 m) 6 ft 1 in (1.9 m) 15 118 ft 10 in (36.2 m) 77 ft 4 in (23.6 m)
5 48 ft 9 in (14.9 m) 9 ft 6 in (2.9 m) 16 122 ft 7 in (37.4 m) 86 ft 8 in (26.4 m)
6 57 ft 11 in (17.6 m) 13 ft 7 in (4.1 m) 17 125 ft 6 in (38.3 m) 96 ft 2 in (29.3 m)
7 66 ft 8 in (20.3 m) 18 ft 5 in (5.6 m) 18 127 ft 9 in (38.9 m) 105 ft 11 in (32.3 m)
8 75 ft 1 in (22.9 m) 23 ft 10 in (7.3 m) 19 129 ft 3 in (39.4 m) 115 ft 10 in (35.3 m)
9 83 ft 0 in (25.3 m) 29 ft 11 in (9.1 m) 20 129 ft 11 in (39.6 m) 125 ft 10 in (38.3 m)
10 90 ft 5 in (27.6 m) 36 ft 7 in (11.2 m) 20.4 130 ft 0 in (39.6 m) 130 ft 0 in (39.6 m)
11 97 ft 4 in (29.7 m) 43 ft 10 in (13.4 m)
Pipe 10 is illustrated.