User guide
JT25 Operator’s Manual Systems and Equipment - 137
Pipe Boxes
CMW
Add Single Pipe
1. Move row select to fifth row.
2. Move shuttles out fully.
3. Remove hold pins (1) on each shuttle and
rotate auxiliary pipe loaders (2) into
position.
4. Remove pipe stop (stored on outside of
drill frame) and attach to front of pipe box.