JT25 Operator’s Manual Operation Overview - 57
Drilling
CMW
Drilling
1. Start system. See page 88.
2. Engage tracker control if desired. See page 121.
3. Drill first pipe. See page 93.
4. Record bore path. See page 100.
5. Enable automated pipeloader system. See page 93.
6. Add pipe. See page 94.
7. Drill remaining pipes in pipe box.
• Correct direction. See page 96.
• Engage cruise control. See page 140.
8. Add additional drill pipe to empty box (see page 136) to complete bore.
9. Surface drill head. See page 100.
• Remove drill head.