User guide

JT25 Operator’s Manual Transport - 81
Load
CMW
Tie Down
Points
Tiedown points are identified by tiedown decals. Securing to trailer at other
points can damage machinery.
Procedure
Loop a transport chain around each tie down point. See chart below for correct distances between tiedown
ends. Make sure tiedowns are tight before transporting.
NOTICE:
Wrenches can open after engine shutdown. Ensure that any downhole tool or pipe in wrenches is
attached to spindle or removed before transport.
Use Grade 7-3/8” (18.7 cm) transport chain to secure drilling unit.
Distance U.S. Metric
A 12-45” 31-114 cm
B 12-45” 31-114 cm
C less than 55” less than 140 cm