Manual

JT30 /JT30 All Terrain Operator’s Manual Conduct a Bore - 126
Remove Pipe
CMW
8. Load pipe into pipe box.
9. Attach saver sub to next pipe.
10. Open front wrench to release pipe.
11. Check pipe box flags to see if row is full. If so, move pipe box to next empty row.
Manual Pipeloader Controls Automated Pipeloader Control
Retract shuttles to delivery chute.
Release grippers and raise lift arms to
place pipe in box.
Lube front threads.
Press RESUME. Display reads
“Removing Pipe”, shuttles will retract to
delivery chute, threads are lubed, grippers
release pipe, and pipe lifters raise to place
pipe in box.
Display reads “REM PIPE Waiting”.
Manual Pipeloader Controls Automated Pipeloader Control
Move carriage forward until saver sub
touches pipe.
Rotate spindle to thread saver sub onto
pipe. Carriage moves forward slowly as
pipe threads together. Slowly tighten joint
to full machine torque.
Move carriage forward until saver sub
touches pipe.
Rotate spindle to thread saver sub onto
pipe. Carriage moves forward slowly as
pipe threads together. Slowly tighten joint
to full machine torque.
NOTICE: Damage can occur when lifting with too many pipes in a column. Be aware of the number of
pipes in the column and check indicator flags as column is filled.