Welder User Manual

Burst Pipe - 44 PR95 Operator’s Manual
Prepare System
CMW
Prepare System
1. Unload bursting unit, power unit and rod boxes
next to burster pit.
2. Connect hydraulic hoses to power unit.
Hoses 1, 2, 3 and 5 are from bursting unit.
Hoses 4 and 6 are from rod makeup device.
3. Tighten hoses fully.
4. Lower bursting unit into pit. Use boards to ensure rods will be level with existing pipe.
5. Place end of rod makeup device arm into hole
on end of rear of bursting unit.
IMPORTANT:
Ensure connectors are clean before
threading hoses onto connectors.
Each connector is a different size and
will only attach to the same-sized
connector.
Connect hose 5 first and work up to
hose 1 for easy access.