Manual
RT115 Tier 3 - PLOW ATTACHMENT 101
SETUP
RT115 Tier 3 - PLOW ATTACHMENT 101
SETUP
8. Attach material being pulled or fed.
Pull:
• Insert material into pulling
grip.
• Tape grip with duct tape.
Feed:
• Remove cable guide.
• Feed cable through tube
from top to bottom.
• Replace cable guide and
tighten fasteners.
• Secure cable.
NOTICE: Keep everyone away from material being installed.
8. Attach material being pulled or fed.
Pull:
• Insert material into pulling
grip.
• Tape grip with duct tape.
Feed:
• Remove cable guide.
• Feed cable through tube
from top to bottom.
• Replace cable guide and
tighten fasteners.
• Secure cable.
NOTICE: Keep everyone away from material being installed.