User manual
Table Of Contents
- Disclaimer
- About
- Contents
- Cautions
- Legend
- In The Box
- Mounting the Landing Gear
- Mounting Frame Arms
- Mounting Electronics and Wiring
- Connecting XT60 Ports on the Center Frame
- Installing Battery
- Setting Up the Landing Gear
- Mounting the Gimbal
- Appendix
- FAQ
- Part List
- The FCC Certification Requirements
- Disclaimer
- About
- Cautions
- Legend
- In The Box
- Mounting the Landing Gear
- Mounting Frame Arms
- Mounting Electronics and Wiring
- Connecting XT60 Ports on the Center Frame
- Installing Battery
- Setting Up the Landing Gear
- Mounting the Gimbal
- Appendix
- FAQ
- Part List
- FCC Statements
Spreading Wings S1000
+
User Manual
©
2014 DJI. All Rights Reserved.
17
Installing and connecting battery
1. Attach battery to battery tray. Do not use an oversized battery. Maximum installation dimension is
80mm×120mm×200mm.
2. Connect the black connector and then the red connector to power on. Disconnect the red connector then
black connector to power off.
Connectors are soldered
Installing Battery