Operating instructions

22
Issue 1.0 March, 2006
Site Requirements
Location
Choosing the Right Environment
System should be installed in a clean, dry, secure location. This location must have adequate ventilation,
and a temperature from 0 to 45 (32 to 113 ), with 10% to 95% non-condensing relative humidity.
DO NOT install the equipment near sources of static electricity, excessive vibration, or water. Avoid direct
sunlight.
Installation Checklist
INSTALLATION REQUIREMENTS VERIFICATION
MOUNTING SURFACE Flat surface with adequate space for main cabinet,
power supply, wiring and optional Battery Backup
cabinet.
AC LINE AC line should be dedicated exclusively to the system.
POWER OUTLET Power Outlet must be a
3-wire grounded outlet plug, having parallel blades
and ground pin.
Input power Line capacity requirements - 10 amperes.
SURGE PROTECTION A Surge Protector is recommended on the dedicated
AC line.
VENTILATION AND TEMPERATURE Humidity: 10% to 95% relative non-condensing
Temperature:32 to 113 (0 to 45 ).
EARTH GROUND A proper ground connection. (14 AWG)
SERVICEABILITY Lighting conditions and working space adequate for
future service.
Equipment Requirements
Unpack, Check and Verify Equipment - Unpack the telephone equipment boxes and verify the contents in
accordance with the packing list provided. If any discrepancies are noticed, please contact TransTel or
Authorized Dealers.
Damaged Boxes - If you notice any damage to the packages, please notify both the shipper and TransTel or
Authorized Dealers at once.
List of parts included in basic KSU box:
KSU Main Cabinet
Power Supply
Mounting Template
Mounting Screws
Station Quick Connectors
Spare Fuses
Cable Cover