Technical data
Rexroth IndraDyn T Operating Torque Motors 12-3
DOK-MOTOR*-MBT********-PR03-EN-P
12.3 General Preconditions
The following preconditions must be provided for successful
commissioning.
•  Adherence to the safety regulations and notes.
•  Check of electrical and mechanical components for safe functioning.
•  Availability and supply of required tools.
•  Adherence to the commissioning procedure described in the following.
Check of All Electrical and Mechanical Components
Carry out a check of all electrical and mechanical components before
commissioning. Heed the following points in particular:
•  Ensured safety of personnel and machine
•  Proper installation of the motor
•  Correct power connection of the motor
•  Correct connection of the encoder system
•  Functioning of available limit switch, door switch, etc.
•  Proper functioning of the emergency stop chain.
•  Machine construction (mechanical installation) in proper and complete
condition.
•  Correct connection and functioning of the motor cooling system.
•  Proper connection and functioning of the drive control unit.
WARNING
Mortal danger, serious injury or damage due to
failure or malfunction of mechanical or
electrical components!
⇒   Troubleshoot mechanical or electrical components
before continuing with commissioning.
WARNING
Risk of injury or mortal danger, as well as
damage due to non-adherence to warnings and
safety notes!
⇒   Heed the warning and safety notes.
⇒   Commissioning must to be carried out by skilled
personnel
⇒   Heed the commissioning procedure described in the
following.