Installation guide
10
INSTALLATION PROCEDURE
Filter
Air Distribution BoxCeiling Template
Grille
FIG. 13
5. The unit installation is now complete and is
ready for operation. The power supply to the unit
may now be turned “ON”.
6. Verify that all features of the installed system
work. Please read the unit User’s Guide or Op-
erating Instructions before proceeding. Check
fan speeds, cooling operation, and furnace
operation (if applicable). If the features do not
work, disconnect the 120 Vac and 12 Vdc power
supplies and verify that all wiring is correct.