Operating instructions
EN
Hobs and Combinations Installing the device
19
• The opening in cabinet must be
– level from side to side and front to rear
• The cabinet opening must be constructed so that no combustible material can be
placed next to the cooktop sides.
• The maximum depth of cabinets installed above the cooking top must be 13 in
(330 mm).
• The device area has to kept clear and free from combustible materials, gasoline
and other flammable vapors and liquids.
• The flow of combustion and ventilation air must not be obstructed.
• Leak testing of the device shall be conducted according to the manufacturer's
instructions.
6.1 Selecting the installation location
When selecting the installation location, observe the following instructions:
• Consider the volume of air required for combustion (chapter “Technical data” on
page 25).
• During operation, there must be air vents with a cross-section of at least 23.25 in²
(150 cm
2
) in the installation room.
• Make sure that minimum distances (fig. 2, page 4) are observed.
• Ensure that there are no drafts at the installation location.
6.2 Installing the device
➤ Create a cutout according to the installation drawing:
– PI8022: fig. 3, page 4
– CE99-ZF: fig. 4, page 5
– CE99-DF: fig. 5, page 5
➤ Affix the device to the worktop using the screws (fig. 6, page 6 – fig. 7,
page 6).
PI-MO-CE-KSK_AMER.book Seite 19 Donnerstag, 21. Mai 2020 10:32 10