Instruction Manual

EN
6. Install one mounting bracket on each side of the drain pan, evenly spaced.
Installing foam handle insulation on Voyager units -
b
1
2
3
1 Foam handle insulation 3 Drain pan
2 Handle opening
7. For Voyager units:
a) Remove the film covering the adhesive backing on the foam handle insulation.
b) Position the foam handle insulation to completely cover the handle opening with the adhesive side facing the drain pan.
c) Press around the handle opening to adhere the foam handle insulation to the drain pan.
8.2 Installing the ducting
Observe the following conditions when installing the ducting:
Ducting must be appropriately sized for your application.
Run ducting as straight, smooth, and taut as possible, minimizing the number of 90.00 ° bends and loops, which can reduce
airflow.
Fasten the ducting securely to prevent sagging.
Do not allow ducting to be flattened or kinked.
Trim excess ducting lengths following installation.
Insulate ducting when it is located in high-heat areas.
Insulate ducting when it is located in high-heat areas.
Do not route ducting through an engine room or any area where it may be exposed to dangerous vapors or exhaust fumes.
If a transition box is used, the total area of supply air ducts going out of the box should be at least equal to the total area of the
supply ducts going into the box. Refer to Specifications on page 6
15